Automatic carbonated water plant / can filling machine for carbonated beverage






Automatic Aluminum Can Filling Line / filling machine
Feature
This automatic aluminum can filling line is a 3 in 1 production line contains washing, filiing and capping. It's mainly used for tinplate, aluminum alloy, plastic cans.
This machine has following fuctions: Automatic lifting of piles of empty cans, automatic turning, automatic washing, filling and capping. It has a higher yields compared with the same specifications.
CONTACT US

Eileen
Zhangjiagang City AK Machinery co., ltd
Mob:+8618915687791
Tel:0086-512-58603903
Fax:0086-512-58571203
http://akmachinery.en.made-in-china.com




RFQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 20-30 days,if complete production line it is 45-60 days.
Q: What is your terms of payment ?
A: Payment ≤1000USD, 100% in advance. Payment≥1000USD, 30% T/T in advance, balance befo






Automatic Aluminum Can Filling Line / filling machine
Feature
This automatic aluminum can filling line is a 3 in 1 production line contains washing, filiing and capping. It's mainly used for tinplate, aluminum alloy, plastic cans.
This machine has following fuctions: Automatic lifting of piles of empty cans, automatic turning, automatic washing, filling and capping. It has a higher yields compared with the same specifications.
Item | Technical Parameters |
Number of stations | Filling 12-60,Sealing 1-15 |
Production Capacity | 2000-24000 Cans/hour |
Compressed air | 0.6Mpa |
Pressure Air Consumption | 0.08M3/min |
Filling Temperature | ≤4ºC |
Cans Diameter | 53~90mm |
Cans Height | 70~220mm |
Filling accuracy | ±5mm |
Filling method | Isobaric filling |
Main motor power | 3.7KW |
Power | 380V |
Machine Size | 3200×2400×1900mm |
Machine Weight | 4500kg |
CONTACT US

Eileen
Zhangjiagang City AK Machinery co., ltd
Mob:+8618915687791
Tel:0086-512-58603903
Fax:0086-512-58571203
http://akmachinery.en.made-in-china.com




RFQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 20-30 days,if complete production line it is 45-60 days.
Q: What is your terms of payment ?
A: Payment ≤1000USD, 100% in advance. Payment≥1000USD, 30% T/T in advance, balance befo